Server Automation difference between failed target

Can anyone explain me the diffrence between failed target (Include in future step and Exclude from future step) in Server automation plan.

I think it’s as follows:
If a target computer fails on this step should subsequent steps in the plan be applied to it (include in future steps) or not (exclude from future steps).

That’s exactly right - basically if a target fails for a particular step, and that target is also used in subsequent steps, this setting controls whether or not the endpoint is targeted by those subsequent steps.

  • Include in future => even though the target failed an earlier step, we should still run the subsequent steps against it

  • Exclude from future => because the endpoint failed earlier in the plan, it does not make sense to run the subsequent steps against it

@gearoid thanks for your vaulable input

1 Like

@Paul_Curran:-thanks…i got your point

1 Like