Getting below error in pe_console.log . Plan engine is keep restarting itself
2020-03-25 12:59:05,842 INFO [PlanEngine] (core.PlanEngine:367) :: IZNENG173I Found (6) plan actions to process.
2020-03-25 12:59:05,845 INFO [PlanEngine] (core.PlanEngine:393) :: Redirecting plan specific log messages for plan action with ID [1142091]
2020-03-25 12:59:06,062 INFO [PlanEngine] (core.PlanExecutionController:1998) :: IZNENG311IValidPlanSettings Automation
Plan (ID: 1142091) was found to have valid plan settings
2020-03-25 12:59:06,559 INFO [PlanEngine] (core.PlanExecutionController:2113) :: IZNENG325I dashboardData related to a
ction id is present.
2020-03-25 12:59:06,561 INFO [PlanEngine] (core.PlanExecutionController:2133) :: IZNENG325I Time diffrence in milliseco nds51627.
2020-03-25 12:59:06,562 INFO [PlanEngine] (core.PlanExecutionController:2144) :: IZNENG325I time difference is less then 1.5 min => more than two engine is trying to process the plancalling postRuntimePlanActionId method to shutdown the e ngine .
2020-03-25 12:59:06,563 INFO [PlanEngine] (core.PlanExecutionController:2182) :: IZNENG325I Already action-id is getting processed by other plan engine instance , shutting down this instance => stop engine.
2020-03-25 12:59:06,563 INFO [PlanEngine] (core.PlanExecutionController:2184) :: IZNENG116I The deployment configuration will not allow this plan engine to start at the current time.