Rollout of patches in Baseline and PCs stuck at Evaluating?

(imported topic written by ktm_200091)

I re-rolled out my baseline for april patches after re-synching the sources with MS09-009 which was re-released, now 50 or so of the pcs are stuck at Evaluating MS09-009.

How can I get around this one?