Remediated dates within excel connector

I currently use the excel connector to report on remediated between dates. Configured as follows:

BES Fixlets
"Fixlet Sites"
Fixlets Attrib - Name & Remediated
Criteria (Remidated >= 1)
Source Release Date >= (Date)

The Dilemma is: I use this for executive reporting for each month. What it doesn’t catch is that we have a “Catch Up” patching that occurs every week to catch failed, or now needed patches. The catchup patches are "not in the source date range so they are not reflected in our reporting. My question is there a way in the excel connector to get it included or in web reporting (i have not found a way in WebReporting to do this yet)?