Modifying success criteria for baselines?

I am creating a baseline for some Red Hat clients in my environment and have been adding critical, high, important and medium fixlets into this baseline for testing.

I was wondering if there was a method to change the success criteria for that baseline? I had checked the client logs located in the __Global/ Log folder and realized the updates didn’t install because they were non-applicable. In the action queue my baseline registers as “Failed” for these machines.

Is this a common problem with anyone else? How did you fix this?

A non-applicable update shouldn’t make the baseline fail. If the baseline fails, that indicates that at least one component of the baseline has failed. Check the status for each component in the action history and identify which of those failed, that would be the cause for the baseline as a whole reporting failure.